Power Y-Cable - Long Lead

Power Y-Cable - Long Lead

$12.15 (excl GST)

This adapter plugs inline between the power supply and two cooling and/or ventilation units.  The leads are approximately 24" in length.  Ensure when powering multiple units that an appropriate power supply is used.  Package also includes one 2.1mm x 5.5mm DC Plug (PA-PLG-21).

Full Description
Qty
  • Description

    This adapter plugs inline between the power supply and two cooling and/or ventilation units.  The leads are approximately 24" in length.  Ensure when powering multiple units that an appropriate power supply is used.  Package also includes one 2.1mm x 5.5mm DC Plug (PA-PLG-21).

  • Reviews

    Reviews

    Be the first to

  • Details

    Details

    Current Stock:
    SKU: CC-PA-YC-LL
    Weight: 0.50 KGS
    Shipping: Calculated at Checkout